Overview
The Yamaha booth at Apex 2026 went all in on the brand’s red, white and black. Continuous Yamaha header bands wrapped the 30×40 footprint overhead, halo-lit tuning-fork logo walls anchored the sides, and the “Revs Your Heart” tagline ran clean around the perimeter. From overnight rig-in through touch-ups on show morning, our crew worked the seams, light lines and graphic edges until the booth read as one piece when the hall doors opened.
Floor Plan
Challenge
Yamaha wanted a 30×40 that would land the brand at full strength on a busy Anaheim show floor: continuous overhead header bands, halo-backlit logo walls, branded tagline panels, and clean product display zones, all reading as one continuous brand wrap.
The Apex 2026 schedule gave us a single 72-hour install window. Every truss segment, graphic skin, electrical run and lit element had to be sequenced before move-in, with no slack in the timeline.
"Yamaha's red is unforgiving. Every seam, every header joint, every halo gap is going to show. The crew had to nail it on the first pass, in 72 hours."
Project Lead, AES
Approach
Site Survey & Rig Plan
We walked the Anaheim Convention Center hall before move-in, locked the rigging points for the overhead header bands, and mapped the power runs for the halo-lit logo walls and tagline backlighting without crossing aisle setbacks.
Pre-Fit Pieces, Checked
The header banding, tagline panels and cut-out logo walls arrived pre-fit and color-checked against Yamaha's red spec by the fabricator, so our crew on-site was assembling approved pieces, with nothing left to fix on the floor.
72-Hour Install
Three shifts, in order: structure and ceiling rig on night one, graphic skins and lit logo walls on night two, AV calibration and finish detail on the last shift. The build stayed inside the 72-hour move-in window.
Pre-Open Walkthrough
A final walkthrough with the Yamaha team covered halo brightness on the logo walls, header band alignment on all four sides, and the finish at every panel seam before we handed the booth over for show open.
Results
The Yamaha booth opened on schedule and held up through every show day in Anaheim. Header bands, halo-lit logo walls and tagline panels all ran clean from open to close, with no rework on the floor, and the 72-hour install wrapped on time.
Booth Highlights
A few frames from rig-in through finish on the Yamaha Apex 2026 install.
Header Bands & Tagline
Continuous red Yamaha header bands and “Revs Your Heart” tagline panels rigged overhead on all four sides, so the brand reads from every angle on the floor.
Halo-Lit Logo Walls
Cut-out Yamaha tuning-fork logos set into tall white side walls, with halo backlighting tuned to glow against the red trim without washing out under hall lights.
Structure & Finish
A 30×40 footprint of clean white panel walls, red base and crown trim, and tight seam detail, set so the booth reads as one piece.